New York, NY -- (SBWire) -- 02/02/2019 --This report studies the global Data Center Construction market size, industry status and forecast, competition landscape and growth opportunity. This research report categorizes the global Data Center Construction market by companies, region, type and end-use industry.
A data center is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and various security devices. Large data centers are industrial scale operations using as much electricity as a small town.
Get Report Sample and Customization: https://www.qyresearchreports.com/sample/sample.php?rep_id=1846159&type=S
Data center construction primarily focuses on designing and building a data center using these key factors:
Capacity: The floorplan of the data center must have enough room to house all servers and equipment for current and perceived future use.
Disaster Tolerant: The data center facility must be able to resist natural disasters and calamities such as earthquakes, floods, snowstorms, tornados, etc. Moreover, the data center construction also looks for ways to prevent disasters, such as adequate water tanks and hoses within the facility for putting out a fire.
Efficient Design: The overall design should be straightforward and require minimal wiring. With the shift towards green data centers, efficient air flow, renewable energy resources and other environmental factors are also taken into consideration.
A data center is used to house an enterprise IT infrastructure. They constitute the backbone of essential business operations. The demand for cloud-based services is increasing among enterprises including many Fortune 500 companies. Several industries are making use of advanced technologies to gain a competitive advantage. The complexities associated with business applications have increased because of the enormous growth in data volumes. This has triggered a greater need for construction and renovation of data centers. Enterprises are focusing on constructing green data centers to reduce power consumption and environmental impact. The construction of a data center includes design, architecture, installation of electrical and mechanical systems, and incorporation of security mechanisms. Infrastructure certifications also play a vital role in the building of data center facilities.
Internet of things (IoT), which requires a data center, is experiencing tremendous growth. Data centers are more suitable for storing and processing data generated by devices connected to the internet, and also to meet the demand for real-time computing. Therefore, the market is set to witness an increase in data centers that are reliable and scalable in nature. The growing demand for cloud computing and big data analytics are also assumed to have an impact on this market, thereby driving the growth of the Latin America Data Center Construction market during the forecast period.
In 2017, the global Data Center Construction market size was xx million US$ and it is expected to reach xx million US$ by the end of 2025, with a CAGR of xx% during 2018-2025.
This report focuses on the global top players, covered
Aceco TI
AECOM
Turner Construction
Equinix
Fluor
DPR Construction
Constructora Sudamericana S.A.
Market segment by Regions/Countries, this report covers
United States
Europe
China
Japan
Southeast Asia
India
Browse Market Research Report @ https://www.qyresearchreports.com/report/global-data-center-construction-market-size-status-and-forecast-2025.htm
Market segment by Type, the product can be split into
Electrical Construction
Mechanical Construction
General Construction
Market segment by Application, split into
Finance
Internet
Telecommunications
Government
Others
The study objectives of this report are:
To study and forecast the market size of Data Center Construction in global market.
To analyze the global key players, SWOT analysis, value and global market share for top players.
To define, describe and forecast the market by type, end use and region.
To analyze and compare the market status and forecast between China and major regions, namely, United States, Europe, China, Japan, Southeast Asia, India and Rest of World.
To analyze the global key regions market potential and advantage, opportunity and challenge, restraints and risks.
To identify significant trends and factors driving or inhibiting the market growth.
To analyze the opportunities in the market for stakeholders by identifying the high growth segments.
To strategically analyze each submarket with respect to individual growth trend and their contribution to the market
To analyze competitive developments such as expansions, agreements, new product launches, and acquisitions in the market
To strategically profile the key players and comprehensively analyze their growth strategies.
In this study, the years considered to estimate the market size of Data Center Construction are as follows:
History Year: 2013-2017
Base Year: 2017
Estimated Year: 2018
Forecast Year 2018 to 2025
For the data information by region, company, type and application, 2017 is considered as the base year. Whenever data information was unavailable for the base year, the prior year has been considered.
Key Stakeholders
Data Center Construction Manufacturers
Data Center Construction Distributors/Traders/Wholesalers
Data Center Construction Subcomponent Manufacturers
Industry Association
Downstream Vendors
Regional and country-level analysis of the Data Center Construction market, by end-use.
Detailed analysis and profiles of additional market players.
About QYResearchReports.com
QYResearchReports.com delivers the latest strategic market intelligence to build a successful business footprint in China. Our syndicated and customized research reports provide companies with vital background information of the market and in-depth analysis on the Chinese trade and investment framework, which directly affects their business operations. Reports from QYResearchReports.com feature valuable recommendations on how to navigate in the extremely unpredictable yet highly attractive Chinese market.
Contact Us:
Brooklyn, NY 11230
United States
Toll Free: 866-997-4948 (USA-CANADA)
Tel: +1-518-621-2074
Follow Us on LinkedIn: https://www.linkedin.com/company/qyresearchreports-com
Email: sales@qyresearchreports.com
Major Progress : Global Data Center Construction Market Forecast Assessment 2018-2025 : AECOM, Equinix, Fluor, Aceco TI
Qyresearchreports include new market research report "Global Data Center Construction Market Size, Status and Forecast 2025" to its huge collection of research reports.